Conceptual four-story mixed-use redevelopment at Fourth Street and West St. Anthony Avenue in downtown Effingham.
Conceptual four-story mixed-use redevelopment at Fourth Street and West St. Anthony Avenue in downtown Effingham.

A Coordinated Path for Downtown Effingham

A privately initiated, phased mixed-use redevelopment advancing adopted goals for downtown housing, commercial activity, integrated parking, strategic growth, and long-term taxable value.

A privately initiated, phased mixed-use redevelopment advancing adopted goals for downtown housing, commercial activity, integrated parking, strategic growth, and long-term taxable value.

Conceptual four-story mixed-use redevelopment at Fourth Street and West St. Anthony Avenue in downtown Effingham.

A Coordinated Path for Downtown Effingham

A Coordinated Path for Downtown Effingham

A privately initiated, phased mixed-use redevelopment advancing adopted goals for downtown housing, commercial activity, integrated parking, strategic growth, and long-term taxable value.

≈$30M

≈$30M

PRELIMINARY PRIVATE DEVELOPMENT INVESTMENT

90–95

90–95

APARTMENTS IN CURRENT CONCEPT

12,000–15,000 SF

12,000–15,000 SF

12,000–15,000 SF

POTENTIAL COMMERCIAL SPACE

4 Stories

4 Stories

CURRENT CONCEPTUAL MASSING

PROJECT STATUS

Active predevelopment.

Active predevelopment.

Active predevelopment.

01 · SITE CONTROL

Core site control and preliminary redevelopment concept

Core site control and preliminary redevelopment concept

Core site control is substantially advanced. Strategic adjoining parcels remain under evaluation where they could improve access, parking, infrastructure efficiency, and long-term development capacity.

02 · COORDINATION

City coordination and master-plan evaluation

City coordination and master-plan evaluation

Current discussions are focused on infrastructure, structured parking, redevelopment tools, and the scope of a broader downtown plan.

03 · VALIDATION

Market validation, schematic design, and capital planning

Market validation, schematic design, and capital planning

Third-party analysis will test Phase I demand, rents, absorption, parking, project economics, and financing while schematic design advances.

04 · EXECUTION

Final approvals, definitive agreements, and construction readiness

Final approvals, definitive agreements, and construction readiness

If feasibility supports the project: final approvals, agreements, construction documents, construction financing, and closing.

Project Management Advisors logo

FORMALLY ENGAGED

Project Management Advisors (PMA) | Brailsford & Dunlavey

Owner’s Representative & Development Advisor

PMA brings institutional development expertise to the owner’s side of the project. Its role is to validate the market, test project economics, control development risk, and guide execution.

30+ YEARS

RESIDENTIAL DEVELOPMENT EXPERIENCE

350+ PROJECTS

RESIDENTIAL PORTFOLIO

30,000+ UNITS

RESIDENTIAL & STUDENT HOUSING

$20B+ VALUE

RESIDENTIAL & STUDENT HOUSING PORTFOLIO

PROJECT LEADERSHIP

LOCAL CONNECTION

Trina Sandschafer, AIA, LEED AP

Vice President & Managing Director — Chicago

Teutopolis native and Chicago office leader providing the project’s local PMA connection.

PROJECT LEAD

G. Matthew Silvers

Vice President of Advisory Services

30+ years guiding complex real-estate development and transaction strategy.

PROJECT LEAD

Brad Moeller

Vice President

25 years delivering residential and student-housing projects across 50 markets.

VISIT PMA →

See the Site’s Potential

See the Site’s Potential

See the Site’s Potential

Drag the divider to compare the current corner of Fourth Street and West Saint Anthony Avenue with the conceptual mixed-use redevelopment.

Drag the divider to compare the current corner of Fourth Street and West Saint Anthony Avenue with the conceptual mixed-use redevelopment.

Drag the divider to compare the current corner of Fourth Street and West Saint Anthony Avenue with the conceptual mixed-use redevelopment.

Conceptual mixed-use redevelopment at Fourth Street and West St. Anthony Avenue.
Existing buildings at Fourth Street and West St. Anthony Avenue.
EXISTING CONDITION · 111 W. ST. ANTHONY
CONCEPTUAL REHABILITATION VISUALIZATION

Preliminary development concept. Final massing, architecture, unit mix, parking capacity and dimensions remain subject to schematic design, engineering, market validation and approvals.

Preliminary development concept. Final massing, architecture, unit mix, parking capacity and dimensions remain subject to schematic design, engineering, market validation and approvals.

Preliminary development concept. Final massing, architecture, unit mix, parking capacity and dimensions remain subject to schematic design, engineering, market validation and approvals.

THE PROJECT RESPONSE

A Material Addition to Downtown Housing

A Material Addition to Downtown Housing

A Material Addition to Downtown Housing

Effingham’s Housing and Economic Recovery Plan identifies a need for approximately 500–775 additional housing units over the next decade. The current concept would contribute approximately 90–95 new apartments above active ground-floor commercial frontage, within walking distance of downtown employment, businesses, services, and existing infrastructure.

Effingham’s Housing and Economic Recovery Plan identifies a need for approximately 500–775 additional housing units over the next decade. The current concept would contribute approximately 90–95 new apartments above active ground-floor commercial frontage, within walking distance of downtown employment, businesses, services, and existing infrastructure.

Effingham’s Housing and Economic Recovery Plan identifies a need for approximately 500–775 additional housing units over the next decade. The current concept would contribute approximately 90–95 new apartments above active ground-floor commercial frontage, within walking distance of downtown employment, businesses, services, and existing infrastructure.

Conceptual mixed-use redevelopment streetscape in downtown Effingham.

Street level

Flexible, divisible commercial space with transparent storefronts, base-building utilities, sidewalks, landscaping, lighting, and opportunities for outdoor activity.

Residential building

The design would prioritize efficient apartment layouts, strong sound separation, durable façades and building systems appropriate for long-term ownership.

WHY THIS SITE?

Why This Site? Why Now?

Why This Site? Why Now?

Why This Site? Why Now?

A downtown assemblage creates a rare opportunity to coordinate housing, commercial space, parking, access, utilities, and public-realm improvements rather than addressing each parcel independently. Fragmented ownership is difficult to recreate once the opportunity is lost.

A downtown assemblage creates a rare opportunity to coordinate housing, commercial space, parking, access, utilities, and public-realm improvements rather than addressing each parcel independently. Fragmented ownership is difficult to recreate once the opportunity is lost.

Aerial GIS map showing the approximately 1.16-acre current core downtown redevelopment site, surrounding streets, and scale.

CURRENT CORE SITE

Approximately 1.16 acres; site control is substantially advanced and sufficient to continue evaluation of the initial redevelopment. BROADER BLOCK CONCEPT — Additional adjoining parcels remain under evaluation and would be required for the larger Block Garage district-scale scenario.

Approximately 1.16 acres; site control is substantially advanced and sufficient to continue evaluation of the initial redevelopment. BROADER BLOCK CONCEPT — Additional adjoining parcels remain under evaluation and would be required for the larger Block Garage district-scale scenario.

DEVELOPMENT DISCIPLINE

PLAN THE BLOCK.
BUILD TO VERIFIED DEMAND.

PLAN THE BLOCK.
BUILD TO VERIFIED DEMAND.

PLAN THE BLOCK.
BUILD TO VERIFIED DEMAND.

Plan the block comprehensively. Then size each construction phase to independently validated demand, achievable rents, absorption, financing conditions, and project economics.

01 — PLAN

Plan parking, circulation, infrastructure, utilities, access, and future development capacity comprehensively.

02 — VALIDATE

Use third-party market analysis to determine supportable units, rents, commercial demand, and absorption.

03 — PHASE

Construct only the portion of the development supported by current market conditions.

04 — EXPAND

Future phases proceed as additional demand is demonstrated.

EFFINGHAM 2050 COMPREHENSIVE PLAN

The City’s Plan Identifies the Direction. This Concept Responds.

The City’s Plan Identifies the Direction. This Concept Responds.

The City’s Plan Identifies the Direction. This Concept Responds.

The adopted plan supports mixed-use downtown housing, proposes expansion of the B-3 district, and directs the City to begin planning for structured parking as downtown density grows. This concept brings those directions into one redevelopment opportunity.

The adopted plan supports mixed-use downtown housing, proposes expansion of the B-3 district, and directs the City to begin planning for structured parking as downtown density grows. This concept brings those directions into one redevelopment opportunity.

IMPLEMENTATION SCORECARD

How the Concept Responds

How the Concept Responds

How the Concept Responds

Housing & Mixed Use

Housing & Mixed Use

PLAN SUMMARY

Encourage mixed-use downtown housing while maintaining Effingham’s small-town character.

PROJECT RESPONSE

Current concept: approximately 90–95 apartments above active ground-floor commercial frontage, subject to market and design validation.

Current concept: approximately 90–95 apartments above active ground-floor commercial frontage, subject to market and design validation.

Effingham 2050 Comprehensive Plan

Downtown Reinvestment

Downtown Reinvestment

PLAN SUMMARY

Expand the B-3 district and redevelop underutilized property to attract investment.

PROJECT RESPONSE

The core downtown assemblage lies within the proposed B-3 expansion area.

The core downtown assemblage lies within the proposed B-3 expansion area.

Effingham 2050 Comprehensive Plan · ED.3.3

Parking & Walkability

Parking & Walkability

PLAN SUMMARY

Begin planning for structured parking as downtown density grows while improving pedestrian access and the streetscape.

PROJECT RESPONSE

Evaluate integrated infill parking together with sidewalks, landscaping, bicycle parking, and crosswalks.

Evaluate integrated infill parking together with sidewalks, landscaping, bicycle parking, and crosswalks.

Effingham 2050 Comprehensive Plan · ED.2.3

Private Investment & Tax Base

Private Investment & Tax Base

PLAN SUMMARY

A larger and more diverse downtown can strengthen the City’s tax base and economic engine.

PROJECT RESPONSE

Approximately $30 million of privately initiated redevelopment investment under the current concept.

Approximately $30 million of privately initiated redevelopment investment under the current concept.

Effingham 2050 Comprehensive Plan

PROPOSED B-3 EXPANSION AREA

Effingham 2050 Comprehensive Plan · ED.3.3

Effingham 2050 Comprehensive Plan zoning map showing the proposed B-3 expansion and the redevelopment site.

The redevelopment site lies within the area identified by the City for proposed B-3 expansion.

FUTURE DOWNTOWN PARKING

“Begin planning for the development of a parking garage that will accommodate future growth to the downtown area.”

“Begin planning for the development of a parking garage that will accommodate future growth to the downtown area.”

Effingham 2050 Comprehensive Plan · ED.2.3

The City has already identified the need for future structured parking. The redevelopment creates an opportunity to evaluate where that infrastructure can produce the greatest long-term public and private benefit.

FEDERAL HILL — NOBLESVILLE, INDIANA

The Garage Is Infrastructure. The Development Is What Surrounds It.

The Garage Is Infrastructure. The Development Is What Surrounds It.

The Garage Is Infrastructure. The Development Is What Surrounds It.

The Garage Is Infrastructure. The Development Is What Surrounds It.

Federal Hill demonstrates a different model for public parking infrastructure: place the garage inside the redevelopment rather than beside it. The public asset supplies parking while private buildings wrap the structure and create active, taxable frontage around it.

Federal Hill demonstrates a different model for public parking infrastructure: place the garage inside the redevelopment rather than beside it. The public asset supplies parking while private buildings wrap the structure and create active, taxable frontage around it.

Federal Hill demonstrates a different model for public parking infrastructure: place the garage inside the redevelopment rather than beside it. The public asset supplies parking while private buildings wrap the structure and create active, taxable frontage around it.

HOW IT WORKS

Straight-down construction aerial of Federal Hill Building A showing the central parking garage wrapped by residential development.

Parking is concentrated inside the block, preserving the street edge for private development.

THE RESULT

Completed Federal Hill mixed-use development in Noblesville, Indiana, showing the parking structure concealed within the urban block.

From the street, the parking structure largely disappears behind an active residential and commercial frontage.

FEDERAL HILL — BUILDING A

118

APARTMENTS

300+

GARAGE SPACES

PUBLIC + RESIDENT

5 LEVELS

STRUCTURED PARKING

CITY-OWNED

PUBLIC INFRASTRUCTURE

Federal Hill is presented as a public-private configuration precedent, not as a direct Effingham construction-cost, valuation, or market comparable.

PARKING INFRASTRUCTURE OPTIONS

Three Parking Strategies. Very Different Redevelopment Potential.

Three Parking Strategies. Very Different Redevelopment Potential.

Three Parking Strategies. Very Different Redevelopment Potential.

Three Parking Strategies. Very Different Redevelopment Potential.

Effingham has three ways to approach structured parking. The key question is which configuration offers the strongest combination of parking efficiency, expandability, direct redevelopment support, and long-term public benefit.

Effingham has three ways to approach structured parking. The key question is which configuration offers the strongest combination of parking efficiency, expandability, direct redevelopment support, and long-term public benefit.

Conceptual Project Garage configuration integrated within the initial downtown Effingham redevelopment.

PROJECT GARAGE CONCEPT

Project Garage

Public parking integrated directly into the initial mixed-use redevelopment.

Conceptual Block Garage configuration supporting district-scale redevelopment in downtown Effingham.

BLOCK GARAGE CONCEPT

Block Garage

District-scale infrastructure designed to support multiple future phases.

Original City Garage

PRIMARY ROLE — Add downtown public parking.

DEVELOPMENT RELATIONSHIP — Supports nearby redevelopment indirectly.

GARAGE GEOMETRY — Defined largely by the existing municipal site.

LONG-TERM POTENTIAL — Adds parking capacity with limited integration into future development.

Project Garage

PRIMARY ROLE — Enable the initial mixed-use redevelopment.

DEVELOPMENT RELATIONSHIP — Integrated directly within private development.

GARAGE GEOMETRY — Designed around the initial project’s footprint and needs.

LONG-TERM POTENTIAL — Supports the initial buildout with potential vertical expansion.

GREATEST LONG-TERM DEVELOPMENT POTENTIAL

Block Garage

PRIMARY ROLE — Serve as district-scale public parking infrastructure.

DEVELOPMENT RELATIONSHIP — Directly supports multiple redevelopment phases.

GARAGE GEOMETRY — Optimize parking efficiency first; build private development around it.

LONG-TERM POTENTIAL — Creates the strongest platform for phased redevelopment of the broader block.

WHY LOCATION & GEOMETRY MATTER

Concentrate the Parking. Preserve the Block for Development.

Concentrate the Parking. Preserve the Block for Development.

Concentrate the Parking. Preserve the Block for Development.

A broader redevelopment site can improve both parking efficiency and the amount of surrounding land available for private development.

A broader redevelopment site can improve both parking efficiency and the amount of surrounding land available for private development.

PRELIMINARY COST-EFFICIENCY TARGET

UP TO ~25% LOWER

UP TO ~25% LOWER

UP TO ~25% LOWER

Potential cost per structured space vs. the earlier site-constrained concept

A flexible garage footprint allows parking geometry to be optimized for efficiency rather than constrained by the dimensions of a predetermined municipal parcel.

LONG-TERM DEVELOPMENT POTENTIAL

≈685,000 SF

≈685,000 SF

≈685,000 SF

Potential gross private-development envelope

Conceptual six-story block scenario

By concentrating parking inside the block, surrounding land remains available for private buildings rather than being consumed by surface parking.

Planning estimates only. See Assumptions & Sources for methodology and qualifications.

TAXABLE VALUE CREATED

New Development Expands the Property-Tax Base.

New Development Expands the Property-Tax Base.

New Development Expands the Property-Tax Base.

New Development Expands the Property-Tax Base.

Both garage concepts can unlock substantial new taxable development. The difference is scale: the Project Garage enables the initial redevelopment, while the Block Garage creates infrastructure capable of supporting a much larger multi-phase downtown buildout.

Both garage concepts can unlock substantial new taxable development. The difference is scale: the Project Garage enables the initial redevelopment, while the Block Garage creates infrastructure capable of supporting a much larger multi-phase downtown buildout.

INITIAL CORE REDEVELOPMENT

PROJECT GARAGE

Structured parking integrated within the initial mixed-use redevelopment.

POTENTIAL ADDITIONAL ANNUAL PROPERTY TAXES

≈ $402K / YEAR

≈ $402K / YEAR

Potential increase above current core-site annual property taxes

DEVELOPMENT SCOPE

≈120,000 SF

Approximate gross private-development area

90–95 apartments + 12,000–15,000 SF potential commercial space

TOTAL POTENTIAL ANNUAL PROPERTY TAXES

≈ $423K / year

≈ $423K / year

Illustrative total using the 2025 tax year / payable 2026 rate

EXISTING ANNUAL PROPERTY TAXES

$21,377 / year

Current core-site baseline used in preliminary tax model

PROPERTY-TAX MODELING VALUE

≈ $22.5M

Conservative fair-market-value assumption used for property-tax illustration; separate from the approximately $30M preliminary private development investment shown earlier.

DISTRICT-SCALE REDEVELOPMENT

BLOCK GARAGE

Expandable structured parking capable of supporting multiple surrounding redevelopment phases.

POTENTIAL ADDITIONAL ANNUAL PROPERTY TAXES

≈ $1.6M–$2.0M / YEAR

Potential increase above current full-block annual property taxes

DEVELOPMENT SCOPE

≈685,000 SF

Potential gross private-development envelope

Conceptual long-term capacity within the broader six-story block envelope.

TOTAL POTENTIAL ANNUAL PROPERTY TAXES

≈ $1.7M–$2.1M / year

≈ $1.7M–$2.1M / year

Illustrative total at long-term buildout

EXISTING ANNUAL PROPERTY TAXES

$60,354 / year

Current full-assemblage baseline

CONCEPTUAL PROPERTY-TAX MODELING VALUE

≈ $90M–$110M

Illustrative long-term valuation range used solely for tax modeling; not an appraisal or development commitment.

THE FISCAL DIFFERENCE IS SCALE

≈4×–5× AS MUCH

POTENTIAL ADDITIONAL ANNUAL PROPERTY-TAX GENERATION

The larger fiscal opportunity comes from the amount of additional private taxable development the Block Garage could support — not simply from providing more parking spaces.

POTENTIAL REDEVELOPMENT REIMBURSEMENT

TO BE NEGOTIATED

Any reimbursement would be limited to available project-generated increment and documented eligible redevelopment costs, subject to City approval and an executed redevelopment agreement.

Illustrative planning estimates only. Current taxes are based on 2025 parcel records; future tax estimates use stated property-value assumptions and the current tax-rate methodology. Figures are not appraisals, assessments, development commitments, or guaranteed projections.

THE PRELIMINARY ASK

Agree on a Defined Next-Step Feasibility Work Plan.

Agree on a Defined Next-Step Feasibility Work Plan.

Agree on a Defined Next-Step Feasibility Work Plan.

No garage, incentive amount, development agreement, or final project approval is being requested at this stage. The immediate objective is to establish a coordinated process for testing the parking, infrastructure, zoning, and redevelopment-tool questions necessary to determine whether the concept is feasible.

No garage, incentive amount, development agreement, or final project approval is being requested at this stage. The immediate objective is to establish a coordinated process for testing the parking, infrastructure, zoning, and redevelopment-tool questions necessary to determine whether the concept is feasible.

ADOPTED CITY PLAN CONTEXT

The City’s Housing & Economic Recovery Plan specifically recommends increased City participation in preparing priority housing and mixed-use sites, including assistance with due diligence, site assembly and control, infrastructure planning and financing, and overcoming site-specific development barriers.

Housing & Economic Recovery Plan · Strategy 2 · p.22

Private capital funds the private development. Any City participation would be separately evaluated and limited to defined public infrastructure or documented eligible redevelopment costs.

Private capital funds the private development. Any City participation would be separately evaluated and limited to defined public infrastructure or documented eligible redevelopment costs.

Private capital funds the private development. Any City participation would be separately evaluated and limited to defined public infrastructure or documented eligible redevelopment costs.

NEXT DECISION SOUGHT

Agreement to proceed with coordinated feasibility work — not approval of a garage, incentive amount, financing commitment, or redevelopment agreement.

POTENTIAL NEXT STEPS

If coordinated feasibility work supports moving forward, later phases may include engineering, appraisal, parking analysis, legal structuring, infrastructure design, redevelopment-tool review, private financing, and formal public approvals.

If coordinated feasibility work supports moving forward, later phases may include engineering, appraisal, parking analysis, legal structuring, infrastructure design, redevelopment-tool review, private financing, and formal public approvals.

Privately initiated preliminary development concept · August 2026